Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Strapping Machine Head For Bar Pile, Steel Belt Strapping Machine
Coil Strapping Machine: Being the exclusive manufacturer of the steel coil baling machine gives us a competitive edge in the market. Our team of experienced engineers and technicians work tirelessly to improve the design and functionality of the machine. With our in-house production capabilities, we have complete control over the manufacturing process, allowing us to deliver a product that is tailored to meet the specific needs of our customers. This exclusivity sets us apart from the competition, making our steel coil baling machine a sought-after choice in the industry.
Argon arc welding type strapping machine head is one of our hot-selling products. The steel belt connection is two argon arc welding points (with high strength and beautiful welding points), located in the belt center and arranged parallel to the belt.
The thickness of steel belt is 0.8-1.2mm. The max steel belt tension is 20000N (adjustable), the connection strength accounts for about 85%-95% of the steel belt itself influenced by surface coating of steel belt, carbon content, welding performance, air humidity, etc.).
Model | DGR-VA |
Power source | Electric: 380V,AC,power 3kw. Pneumatic:1reversing cylinder (pressing-belt-wheelcylinder),2pressing-belt-head cylinder,3 pressing-belt-tail cylinder, 4 flanging cylinder Pressure: 4-6 bar, Max instantaneous gas consumption:Max 0.9L/s |
Strapping speed | General working time of head in strapping process is 15.6 seconds/belt (Argon arc welding points require air supply for cooling to prevent oxidation) |
Steel belt connection | Two argon arc welding points (with high strength and beautiful welding points), located in the belt center and arranged parallel to the belt |
Steel belt tension | Max.20000N (adjustable) |
Consumable accessories list | Feeding-belt wheel, Tensioning wheel, Belt cutter, Welding handle, Soldered base |
Machine maintenance | Suggest providing minor maintenance every six months and major maintenance every year |
Daily maintenance | As per general equipment maintenance |
Steel belt spec | Width 19mm, 25mm,32mmThickness 0.8-1.2mm |
Applicable environment | Normal temperature environment and suitable environment for argon arc welding |
Applicable objects | Galvanized coil, cold rolled coil, steel pipe pile, profile pile, bar pile, sheet pile, aluminum ingot pile, steel ingot pile, pipe pile, wood pile, waste pile, etc |
Strength of belt joint | The connection strength accounts for about 85%-95% of the steel belt itself (influenced by surface coating of steel belt,carbon content, welding performance, air humidity, etc) |
Team Experience
Our team leaders have studied under a doctoral advisor certified by the State Department who has excelled in the field of industrial packaging.
Manufacturing
The factory implements advanced mechanical standards, with highly educated employees and experienced workers.
Quality Assurance
Equipment is manufactured in strict accordance with metallurgical industry standards, and can generally operate at ultra-high temperatures of up to 800 degrees Celsius.
Full range of services
We have diversified services, from single item baler to whole unit packaging, high quality, short delivery time. We are your wise choice.
Product design
Our products are of strongly resistance to blows, long-lasting and durable, and suitable for various quality steel belts, which greatly reducing the cost of customers.
After Sales Service
1. Manuals / Videos of machine installation, adjusting, setting, maintenance are available
2. Engineer oversea services are available.
3. Quick delivery for spare parts replacement
4. One year of quality warranty
Shenzhen Packway Technology Development Co., LTD, Founded in March 2005, has been at the forefront of innovation, constantly striving to develop cutting-edge technologies and solutions. We currently operate three subsidiary companies, each connected with different sectors of the machinery market.
Q1. What are your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown wooden cartons. If you have a legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What are your terms of payment?
A: T/T 50% as deposit, and 50% before shipping. We'll show you the photos of the products and packages before you pay the balance.
Q3. What are your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 2-3 months to produce the products, and 5 days by air, 25 days of the ship by sea. The specific delivery time depends on the items and the quantity of your order.
Q5: How is the warranty system?
A: 1~5 years. (upon the deal)
Q6. Do you test all your goods before delivery?
A: Yes, we have a 100% test before delivery.